Project Number: 
10-29
Project Description: 

To (1) evaluate the performance history of continuous “jointless” bridge decks in Georgia; (2) determine details that have proven to work best; and (3) recommend the maximum/optimum lengths of jointless bridge decks utilizing these details.

Posters:

  1. Evaluation of Performance and Maximum Length of Continuous Decks in Bridges (September 2013)

 

 

Principle Investigator(s) Contact Information: 
lawrence.kahn@ce.gatech.edu , don.white@ce.gatech.edu
University(ies): 
Georgia Institute of Technology
Start and End Dates: 
02/09/11 - 08/09/12