Poster 19-10

Flash Tracking Implementation Guidelines Complementing Existing Design-Build Manual


PI: Pardis Pishdad-Bozorgi

Co-PI(s): Jesus M. de la Garza

Institution(s): Georgia Institute of Technology


Abstract

The overarching objective of this research is to develop Flash Tracking implementation guidelines that would complement the existing Design-Build Manual. These standardized implementation guidelines are captured in an appendix to the DesignBuild Manual. The research methodology comprised three phases. In the first phase, the research team studied and analyzed the effectiveness of flash track best practices implementation on three GDOT projects—namely, improvements to the I-16/I-95 interchange, the I-85 Widening, and SR 400 EL. In the second phase, the team reviewed and analyzed the GDOT DesignBuild Manual to identify its strengths, weaknesses, opportunities, and threats (i.e., a SWOT analysis) in terms of its treatment of flash track best practices. This involved cross-referencing the D-B manual against the 83 flash track best practices, to determine the presence or absence of each flash track best practice in the manual. In the third phase, an appendix to the D-B manual was developed to serve as an official source on implementing flash track best practices on D-B projects. Furthermore, modified RFQ and RFP templates were developed to incorporate flash track practices on projects and specific recommendations were made for the RFQ and RFP for the Houlihan Bridge P.I. No. 0013741/0013742 – SR 25 at Savannah & Middle River Bridges.


Please comment below with any statements or questions you may have. Also let GTI if you would be interested webinars or presentations on similar topics.

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer